HOLLAND BOARD OF PUBLIC WORKS

2008 Construction Projects

 

12th St, Pine to Fairbanks

College Ave, 14th to Graves Place

 

Schedule

·        Construction begins                                                                    May 2008

·        Construction substantially completed                                       Thanksgiving 2008

 

Specifications

·        12th St, Pine to College:  Water main, sanitary sewer and roadway replacement.  Storm sewer will be replaced as necessary.  The recently replaced Pine and River intersections will not be disturbed.

·        12th St, College to Columbia:  Water main and sanitary sewer replacement.

·        12th St, Columbia to Lincoln:  Water main and sanitary sewer replacement.  Restoration will reflect the planned vacation of this portion of 12th St.

·        12th St, Lincoln to Fairbanks:  Water main and sanitary sewer replacement.  The roadway will be resurfaced as necessary.

·        College, 14th to Graves Place:  Water main replacement.  Roadway and storm sewer will be replace between 12th St and Graves Pl.

·        12th St Construction Plan Set.pdf

 

Funding

·        This project will be funded by the Holland BPW and the City of Holland with no anticipated out-of-pocket costs for customers and residents.

 

Additional Information

·        Customers will receive 24 hours notice prior to interruptions in water service.

·        Sewer service interruptions are not anticipated.

·        Access will be maintained for customers located within the project limits.  However, driveway access may be impacted for short periods of time as part of typical construction activities.  Additional driveway access restrictions may be necessary when pavement is being placed.

·        Sprinklers and/or landscaping located within the affected rights-of-way are subject to the City’s Lawn Component Policy located herein.

Lawn Component Policy.pdf

·        Affected customers will receive additional information in the form of mailings and meetings as plans and schedules are developed.  One of the mailings will include contact information for Holland BPW, City of Holland and Contractor personnel for use in the event of questions or concerns.

·        March 25, 2008 Open House Invitation.pdf

·        May 15, 2008 Open House Invitation.pdf

·        Please visit this site regularly for updates.

 

Contacts

 

On-Site Inspector                              John Walsh                            616.723.3914

Water & Sanitary Concerns             John Schroeder                     616.218.9965

Road & Drainage Concerns            Ben                                         616.928.2427

 

Wyoming Excavators                        Nate                                        616.691.7368 x 12

After-Hours Concerns                       Paul                                        616.293.3926

 

Life of Property Threatening Emergencies                                    911

 

Country Club Rd, Euna Vista to 16th

 

Schedule

·        Construction begins                                                                    May 12, 2008

·        Construction substantially completed                                       September 30, 2008

 

Specifications

·        Country Club Rd, 8th to 16th:  Water main, storm sewer and roadway replacement and curb & gutter, sidewalk and sanitary sewer installation.

·        Country Club Rd, Euna Vista to 8th:  Storm sewer installation and roadway replacement.

·        Country Club Rd Construction Plan Set.pdf

 

Funding

·        This project will be funded by the Holland BPW and the City of Holland.  Affected customers and residents will be assessed for curb & gutter, sidewalk and sanitary sewer.

 

Additional Information

·        Customers will receive 24 hours notice prior to interruptions in water service.

·        Sewer service interruptions are not anticipated.

·        Country Club Rd from 8th to 16th will be closed to all through traffic during the project.  However, local traffic will be maintained for customers and residents living within the project limits.  Driveway access may be impacted for short periods of time as part of typical construction activities.  Additional driveway access restrictions may be necessary when pavement is being placed.  During these times you will be allowed to part overnight on side steets without being cited.  The Holland Police Department will be informed not to cite vehicles registered to Country Club Rd addresses.

·        Sprinklers and/or landscaping located within the affected rights-of-way are subject to the City’s Lawn Component Policy located herein.

Lawn Component Policy.pdf

·        Please visit this site regularly for updates.

 

Contacts

 

On-Site Inspector                              Gene                                       616.396.0255

Water & Sanitary Concerns             Doug                                       616.836.3712

Road & Drainage Concerns            Ben                                         616.928.2427

 

Triangle Excavators                          Steve                                      616.355.7787

After-Hours Concerns                       Steve                                      616.836.1942

After-Hours Concerns                       Mike                                        616.836.7194

 

Life of Property Threatening Emergencies                                    911

 

40th St, Washington to College

 

Schedule

·        Construction                                                                                Spring / Summer 2009

 

Contacts

General Project Information                                                             Adam  616.355.1564

 

Updated:  09.3.2008 - ARP